• Sprint Sand and Clay Banner Image

Finished Projects Gallery | Harpers Preserve

This was a 1.6 million dollar project which called for the excavation and removal of over 80,000 cubic yards of general fill in addition to importing over 20,000 cubic yards of clay to be used for lining the bottom and the side slopes of the detention pond. The project was a very unique design of a channel that included installation of a concrete hard edge and retaining wall and included the installation of unique aerators to oxygenate the water in order to help promote fish habitat.

share    Email  
A horizontal border image of sand, gravel, and dirt
Central Dispatch: 281-277-5404

All Content © The Sprint Companies